Recent work.
Real jobs from Bohling's Facebook page and Google listing, with what went into each one.

A furnace replacement, before and after.
February 2024. A 5" filter rack, an intake pipe for fresh outside air, and a new humidifier went in with the furnace.
More installs

Full replacement
March 2025
- High-efficiency furnace
- 5" filter
- Aprilaire humidifier
- Zoning

Zoned upgrade
December 2024
- Multi-stage furnace
- Zoning
- Wi-Fi control

Three zones, one furnace
January 2024
- 90% 2-stage furnace
- Basement, 1st and 2nd floor zones
- Wi-Fi thermostats
- 5" media filter

Horizontal install in a tight crawlspace
January 2024
- 90% furnace
- 2-stage AC
- Multi-floor zoning
- 5" filter

Zoned Armstrong furnace
Armstrong Air Pro Series
- Armstrong Air Pro Series
- Zone panel

Two-stage upgrade
April 2024
- 2-stage furnace
- 5" filter
- Smart thermostat

Armstrong air conditioner
Outdoor unit
- Armstrong Air

Out with the old, in with the new
October 2024
- Multi-stage furnace
- Zoned heating and cooling
- Humidifier
- 5" filter rack

Ductwork redone
January 2024
- New ductwork
- Zone control

Furnace install
October 2024
- Zone panel

Furnace install
October 2024
- Vent piping

Humidifier on the ductwork
December 2024
- Humidifier
More on Bohling's Facebook page.
